When you're planning a concrete patio, the pour itself is one day — but the project impacts your yard for about a week. Here's what to expect, so you can plan and we can minimize disruption.
Day 1–2: Site Prep and Excavation
We mark the patio area, excavate to the right depth, and bring in base material. Equipment and material delivery will use the access route we planned during the walk-through. This is the most disruptive phase — equipment on your property, material piles, and the access path getting traffic.
Day 2–3: Base Prep and Forming
We compact the base, set forms, place reinforcement, and finalize drainage grading. The area is prepped and ready for the pour. Less equipment traffic than excavation, but the area is still an active work zone.
Pour Day
The concrete truck arrives, we pour, screed, float, and finish. This is a busy day — the truck, the crew, and the pour happen fast. Once the concrete is placed and finished, the work zone goes quiet.
Cure Period
The concrete cures over the following days. We strip forms and clean up. The patio is off-limits for foot traffic for 24–48 hours and for furniture for several days. We tell you the exact timeline.
How We Minimize Yard Disruption
During the walk-through, we plan the access route — where equipment will travel, where materials will be staged, what landscaping to protect. We tell you what will be impacted and how we'll minimize it. No surprises after the fact.
What We Need From You
Clear access to the work area, decisions on finish and dimensions finalized before we start, and understanding of the cure timeline. If you have irrigation or landscaping near the patio area, let us know during the walk-through so we can plan around it.
See our process page for the full Tier Mountain Standard, and our patios service page for what's included.
Your start date goes in the contract before we take a dollar of your deposit. Owner-operated, Valley-local, built for Utah freeze-thaw.