
Concrete RV Pads in West Valley City, UT
Owner-operated · West Valley City based · Written start dates · Free estimates
Who It's For
RV owners who need a dedicated parking pad for a Class A, travel trailer, fifth wheel, or truck + trailer combo.
Not For
Gravel-only pads (we pour concrete — see our gravel vs concrete comparison).
What It Is
Site prep, base, reinforcement sized to your rig's weight, pour, and broom finish for a dedicated RV parking pad.
Problems It Solves
Gravel pads that rut and sink under heavy rigs
Pads too thin for Class A motorhomes
No reinforcement — cracking under point loads
Poor drainage — water pools under the rig
What's Included
Proper compacted base
Reinforcement sized to rig weight
5–6 inch slab for heavy rigs
Control joints
Drainage planning
Broom finish for traction
Travel Trailer vs Class A: What Changes
| Factor | Travel Trailer | Class A Diesel |
|---|---|---|
| Slab Thickness | 5 inches | 6 inches |
| Reinforcement | Standard mesh/rebar | Heavy rebar |
| Base Prep | Compacted granular base | Compacted granular base (deeper) |
| Drainage | Standard slope | Enhanced drainage planning |
The Tier Mountain Standard — Applied to RV Pads
Walk
On-site walk-through + straight quote
I meet you on your property. We walk the site, talk about what you're pouring, discuss drainage and access, and I give you a straight-talking quote — no vague ranges, no 'we'll see.'
Sign
Your start date written into the contract
Your start date goes in the contract before we take a dollar of your deposit. No 'maybe next week.' No 'sometime this month.' A date you can plan around.
Pour
Proper base, reinforcement, and control joints
Proper compacted granular base, reinforcement sized to your load, and control joints placed for Utah freeze-thaw. We prep for the climate we actually live in.
Walk Again
Owner walks the finished job with you
I personally walk the finished job with you before final payment. If it doesn't meet the Tier Mountain Standard, it gets fixed. The owner who quoted the job is the owner who finishes it.
What to Expect
Typical RV pad: 1–2 days on site depending on size and site access.
Cost Drivers
Pad dimensions, slab thickness (Class A vs travel trailer), site access, base prep, haul-off.
Real pricing published after verification. See our pricing page for the full breakdown.
RV Pads — Common Questions
Ready for a Date You Can Plan Around?
Call or text (385) 503-9559 — or tell us your street and what you're pouring.
Owner-operated · West Valley City based · 300 sq ft minimum · Free estimates
